Quick contact info

You can contact us via email, WhatsApp, or speak with us directly.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image + (08) 620 522 09 WhatsApp 0414 607 240 icon_widget_image office@inspectorgroup.com.au
  /  Practical Completion Inspection Checklist
Perth New Home Handover Guide

Practical Completion Inspection Checklist

Understand what may be reviewed before handover, how visible defects and incomplete work are documented and what a practical completion inspection does not replace.

A Practical Completion Inspection Reviews the Finished Home

It is a visual assessment of accessible areas near the end of construction. The report records visible defects, incomplete work, damage and finishing issues observed at the time of inspection.

Before Handover
Understanding Practical Completion

The Home May Still Have Minor Defects or Omissions

Practical completion generally means the work has reached a stage where the home is reasonably capable of being used for its intended purpose, even though minor defects or incomplete items may remain.

✓ Review visible completed work before handover. ✓ Identify incomplete or damaged items. ✓ Record defects with photographs and locations. ✓ Note inaccessible or unfinished areas. ✓ Provide a written list for client review.

Visible Completion

The inspection reviews whether accessible building work appears complete and identifies visibly unfinished components.

Defects and Damage

Visible defects, poor finishes, damage and components requiring further builder attention are documented.

Photographic Evidence

Photographs support the written findings and help identify the location of each reported item.

Handover Preparation

The completed report provides an independent list that can be reviewed with the builder before or during the handover process.

Main Inspection Areas

What Is Normally Reviewed at Practical Completion?

The exact scope depends on the agreed inspection service, property design, construction progress and safe access available on the day.

Interior

Visible walls, ceilings, floors, doors, windows, cabinetry, fittings and completed internal finishes may be reviewed.

Exterior

External walls, windows, doors, finishes, drainage components and accessible external work may be assessed.

Roof and Roof Space

Visible roofing, gutters, penetrations and accessible roof-space elements may be reviewed where safe access is available.

Wet Areas

Accessible bathrooms, ensuites, laundries and kitchens are reviewed for visible defects, incomplete work and finishing issues.

Garage and Site

The garage, paths, drainage, retaining walls and other accessible site items may be reviewed where included in the agreed scope.

Completion and Presentation

Missing components, incomplete finishes, construction debris, damage and presentation issues may be recorded.

Detailed Handover Checklist

Typical Items Reviewed During the Inspection

Open each section to see examples of visible items commonly considered during a practical completion inspection.

Internal Walls, Ceilings and Floors Visible finishes and completed internal surfaces.

Internal surfaces are visually reviewed for obvious defects, damage, incomplete finishes and presentation issues.

Visible cracking, damage or poor finishing Paint coverage and surface presentation Ceiling joints and visible undulations Floor finishes and damaged areas Skirtings, cornices and junctions Incomplete patching or cleaning
Doors, Windows and Cabinetry Accessible operation, alignment, finishes and visible damage.

Doors, windows and accessible cabinetry may be checked for visible defects and basic operation without dismantling hardware.

Door alignment and visible damage Handles, catches and accessible hardware Window opening and closing Frames, seals and visible gaps Cabinet doors and drawer operation Benchtop and joinery finishes
Kitchens, Bathrooms and Laundry Visible wet-area finishes, fixtures and accessible components.

Wet areas are reviewed for visible workmanship issues, incomplete items, damage and accessible fixture operation.

Tiles, grout and sealant finishes Visible falls and drainage concerns Cabinetry and benchtop condition Taps and accessible fixtures Shower screens and mirrors Incomplete fittings or damaged finishes
Building Exterior External walls, finishes, openings and visible drainage components.

Accessible exterior areas may be reviewed for visible damage, incomplete finishes and workmanship concerns.

Brickwork, render and cladding finishes External doors and windows Visible flashings and sealants Downpipes and drainage connections Eaves, fascia and external linings Incomplete painting or damaged surfaces
Roof Exterior and Roof Space Visible roof work where safe and reasonably accessible.

Roof access depends on height, pitch, surface condition, weather and safe access arrangements.

Roof coverings and ridge finishes Visible flashings and penetrations Gutters and accessible drainage Accessible roof framing Insulation coverage where visible Construction debris or incomplete work
Garage, Paths and Site Areas Accessible ancillary work included within the agreed scope.

External site areas may be reviewed where construction is complete enough to allow a meaningful assessment.

Garage walls, ceilings and floors Garage door and accessible hardware Paths, paving and visible levels Surface drainage and grates Retaining walls and fences where included Incomplete landscaping or site cleaning
Understanding the Findings

Common Types of Practical Completion Findings

Not every listed item has the same importance. The report may contain incomplete work, visible defects, damage, maintenance items and limitations.

Incomplete Work

Missing fittings, unfinished finishes, incomplete connections or work not completed at the time of inspection.

Visible Defects

Workmanship concerns, cracking, gaps, poor alignment, damaged materials or other observable building issues.

Damage

Scratches, chips, dents, stains, broken components and damage caused during construction or final trade activity.

Items Requiring Monitoring

Some conditions may require observation over time or further review after the building has been occupied.

Presentation and Cleaning

Construction residue, incomplete cleaning, labels, protective coverings or debris affecting final presentation.

Further Assessment

Some findings may require review by the builder, engineer, licensed trade or another appropriate specialist.

Before the Inspection

How to Prepare for Practical Completion

Confirm that the home is sufficiently complete and that safe access has been arranged before the inspection date.

Confirm the Timing

Arrange the inspection when the builder advises that the home has reached practical completion and before handover where possible.

Provide Approved Plans and Documents

Supply the approved building plans, relevant specifications and variation documents so visible and accessible work can be compared with the intended construction.

Arrange Full Access

Confirm access to the home, garage, roof space, exterior and other areas included in the inspection scope.

Allow Time to Review the Report

The report should be reviewed before important handover decisions or deadlines where the building program permits.

Different Responsibilities

The Inspector Reports Findings — the Builder Manages the Work

An independent inspector provides a separate visual assessment. The builder remains responsible for construction, rectification and completion under the building contract.

Independent Assessment

Building Inspector

The inspector records visible and accessible conditions observed during the practical completion visit.

Reviews areas within the agreed scope Compares visible work, where applicable, with approved plans, the NCC and relevant Australian Standards Documents visible defects and incomplete work Provides supporting photographs Identifies inspection limitations May recommend further specialist review
Construction Responsibility

Builder

The builder manages construction and determines how reported items are reviewed and addressed under the contract.

Controls the construction site and access Coordinates trades and completion work Reviews the reported items Determines rectification methods Manages handover and contract administration
Practical Completion Report

What Should the Completed Report Contain?

The report should clearly identify the location, visible condition and significance of each reported item.

Property and Inspection Details

The report identifies the property, inspection date, agreed scope and areas reviewed.

Supporting Photographs

Relevant photographs help identify the location and illustrate the visible condition of the finding.

Clear Finding Descriptions

Each item should explain what was observed without overstating what can be established visually.

Recommended Attention

The report may recommend builder review, rectification, completion or further specialist assessment.

Inspection Limitations

Incomplete, concealed, unsafe or inaccessible areas should be recorded in the report.

Plans, NCC and Standards

Where the relevant documents are supplied, visible and accessible work is reviewed against the approved building plans, applicable National Construction Code requirements and relevant Australian Standards within the agreed scope.

Important Boundaries

What a Practical Completion Inspection Does Not Do

It is an independent visual inspection at a specific point in time. It does not replace specialist certification, statutory approvals or the builder’s responsibilities.

×

Destructive Investigation

Finished surfaces are not opened, removed or damaged to inspect concealed components.

×

Continuous Site Supervision

The inspector has not supervised the construction process and cannot report on every earlier stage.

×

Certification of Specialist Systems

Electrical, plumbing, gas, engineering and other systems may require separate licensed certification.

×

Guarantee of a Defect-Free Home

A visual inspection cannot identify every concealed, future or inaccessible defect.

×

Control of Rectification

The inspector reports findings but does not direct trades or determine how the builder will rectify the work.

×

Legal or Contractual Advice

Questions about payments, handover, disputes or contract rights require advice from an appropriate adviser.

Keep a written record of defects and communications.

In Western Australia, applicable defect-notification periods and other rights depend on legislation and the building contract. Report concerns promptly in writing and obtain independent contractual advice where required. Review against approved plans, the National Construction Code and Australian Standards is limited to visible and accessible work within the agreed scope and is not a full certification or design audit.

Frequently Asked Questions

Practical Completion Inspections in Perth

General information for people preparing for new-home handover in Western Australia.

When should the practical completion inspection be arranged?
It is generally arranged when the builder advises that the home has reached practical completion and before handover where the construction program permits. Confirm the timing and access requirements with the builder.
Does practical completion mean that every item must be perfect?
Not necessarily. Practical completion can occur even though minor defects or omissions remain, provided they do not prevent the home from being reasonably capable of its intended use. The contract wording is important.
Does the inspection include the roof space?
The roof space may be inspected where it is complete, safe and reasonably accessible. Small access openings, low clearance, insulation, stored materials or unsafe conditions may restrict the inspection.
Are electrical and plumbing systems fully tested?
No. A practical completion inspection does not replace licensed electrical, plumbing, gas or specialist certification. Accessible fixtures may be observed or operated within the agreed visual scope.
What happens after the inspector finds defects?
Review the report and provide the relevant findings to the builder in writing. The builder remains responsible for reviewing the items and managing rectification under the building contract.
Should I attend the practical completion inspection?
Attendance depends on site rules, builder permission and the inspection arrangement. The written photographic report should still clearly identify the relevant findings whether or not the client attends.
Can every defect be identified during one inspection?
No. Concealed components, incomplete areas, restricted access and conditions that develop after handover may not be visible during a single inspection.

Preparing for New-Home Handover in Perth?

Inspector Group provides independent practical completion inspections with clear photographic reporting of visible defects, incomplete work and finishing issues.

Contact Inspector Group to Arrange an Inspection